The design team should continue in this manner until all components have been tested
ensuring that all part modifications are verified by Familiarization, Functionality, and
Testing. When all components are verified, the whole device should be tested. Again,
any problems that result from testing the device should be approached via the Design
Trinity according the procedure outlined above for component testing.
ARRIVING AT A DESIGN SOLUTION
By cycling through the Design Trinity, the design team will arrive at a workable design
solution. Although it may require multiple trips through Familiarization, Functionality
and Testing, these steps will lead to a successful design solution.